Onboarding and Setup Timeline

Last updated 24 November 2019

This timeline is intended to help you (and us!) take you from contract to planning for next year with a minimum of mystery.

And for easy reference and delegation, the graphics needs are summarized in a separate document.

First Time Setup

There are a few things you'll only need to think through the first time around, but it wouldn't hurt to read over this checklist annually to ensure nothing major has to change.

  • Access

  • Cosmetics

  • Events and registration structure

  • Financial

  • Registration Identity

  • Data Warehouse

Annual Setup

The timeline below is a sample, not a ruleset. The months are indicated based on a June or October event, respectively.

8 Months Out (November | February)

  • Decisions

  • Events and registration structure

6 Months Out (January | April)

  • Configuration

  • Preview/Testing

  • Cosmetic Edits

    • Review/update images (see the graphics needs document for a comprehensive listing)

    • The graphics specs are embedded in the admin as well.

  • Copy Edits

    • Update blurbs for

    • consult the what's where guide to locate each of these fields; some may need updates in multiple locations

  • Name Tag

Three Months + One Week Out (March | July)

  • Testing

  • Self Mod

  • Users

  • Training

Three Months Out (March | July)

  • Data Warehouse

  • Process

  • Reporting

  • Printing (if applicable)

One Month Out (May | September)

  • Data Warehouse

  • Maintenance

  • Printing (if applicable)

  • Planning

Two Weeks Out (May | September)

Week Of Event

  • Data Warehouse

  • Communications

  • Printing (if applicable)

During your event

Week After

Month After

Last updated